Fiber optic cable management in the
7360 ISAM FX-16 shelf
Figure 68
Procedure 26
Use the following procedure to mount the fiber management guide onto the 7360 ISAM FX-16.
1
2
146
Fiber routing without a fiber management guide for
7360 ISAM FX-16
P W
R
A /S
A L
1
M
P W
R
3
2
A /S
5
4
1
A L
M
P W
7
6
3
R
2
A /S
8
5
4
A L
1
7
M
P W
6
R
3
2
A /S
8
5
4
1
A L
M
7
6
3
2
8
5
4
7
6
8
To mount the fiber management guide
Note — The 7360 ISAM FX-16 fiber management bracket pre-
assembly that is included in the heat and fiber baffle kit must be installed
after the heat and fiber baffle kit.
Ensure the fiber management bracket is already mounted onto the fiber management cable
bracket on the shelf as described in Chapter
5.4 "Installing a 7360 ISAM FX-16 heat and fiber baffle
Align the pre-assembled fiber management bracket and fiber guiding elements with the finger
guides located on the top of the shelf; see Figure 69.
3HH-12893-AAAA-TCZZA
ANSI Hardware Installation Manual
P W
R
A /S
A L
1
M
P W
R
3
2
A /S
5
4
A L
1
M
P W
7
6
3
R
2
A /S
8
5
4
1
A L
7
M
P W
6
R
3
2
A /S
8
5
4
A L
1
M
7
6
3
2
8
5
4
7
6
8
5 "Installing a 7360 ISAM FX-16
DRAFT
25373
shelf", section
kit".
Issue: 09