Table of Contents

Advertisement

Opening command test The opening command test can be performed directly on the release or from Ekip Connect.
48 | © 2013 ABB | 1SDH001000R0002 - L7804
To perform the release test:
Phase
Operation
1
Make sure that the CB is closed and that there are no primary currents present
2
Connect a module to the front test connector of frontal test
3
Press the iTest push-button for at least 9 seconds
4
Check that the CB opens and that the TU Reset button comes out
To perform the test from Ekip Connect:
Phase
Operation
1
Make sure that the CB is closed and that there are no primary currents present
2
Connect Ekip T&P or Ekip Bluetooth to the front test connector
3
Start the communication with Ekip Connect
4
Select the Trip Test command
5
Check that the CB opens and that the TU Reset button comes out
Further information on Ekip Connect is available from the web site http://www.abb.com/
abblibrary/DownloadCenter/, in particular with the manual 1SDH000891R0002.
ABB | SACE Emax 2
Ekip Dip protection release | 4 - Test

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sace emax e2.2Sace emax e4.2Sace emax e6.2

Table of Contents