152 | © 2013 ABB | 1SDH001000R0002 - L7804
Continued from the previous page
Measurements on the Display
The measurements are available by following the path Main page - Measurements page - Page
Power Controller , they are:
Measurement
Description
Ea
Expected energy
DT
Time elapsed inside of the evaluation window
LOADS
Number of loads monitored
LOADS Shed
Number of shed loads
Sp
Shed priority set
T
Evaluation window
Info on the display
Information is available on the activation and status of the 15 loads by following the path Main
page - Menu - About - Power Controller.
Ekip Touch protection release | 21 - Ekip Power Controller
ABB | SACE Emax 2