Huawei USG6000 Series Hardware Manual page 324

Version v100r001 & v500r001
Hide thumbs Also See for USG6000 Series:
Table of Contents

Advertisement

HUAWEI USG6000 Series
Hardware Guide
2.
3.
Issue 08 (2017-06-30)
Figure 3-58 Positions of adjustable guide rails 21242247 and floating nuts
For floating nuts
(device nuts)
Positioning block
Install the floating nuts that match M6 screws at the positions marked in
Figure
3-57, and
Figure
Figure 3-59 Installing floating nuts
1
Install guide rails. As for adjustable guide rails, identify the left and right guide rails, and
the front and rear ends of each guide rail according to the F/L and F/R flags on the guide
rails.
Use M6 screws to fix the L-shape guide rails at the positions specified in
shown in
Figure
3-60.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
1U
3-58.
Figure 3-59
illustrates how to install a floating nut.
2
3 Hardware Installation
Rear
Front
Figure
3
Figure
3-56,
3-56, as
310

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents