Huawei USG6000 Series Hardware Manual page 276

Version v100r001 & v500r001
Hide thumbs Also See for USG6000 Series:
Table of Contents

Advertisement

HUAWEI USG6000 Series
Hardware Guide
----End
Follow-up Procedure
After the antennas are installed, do as follows:
l
l
Issue 08 (2017-06-30)
Figure 3-15 Installing the antennas (when the USG is mounted to a wall)
1
1
3
5
W iF
i 1
0
7
2
4
6
L T
1 2
V
; 2
Before the USG is powered on: Check whether the cables and connectors are free of
damage or breakage and are connected properly.
After the USG is powered on: Run the display cellular command in any view to check
the Current RSSI value. If the value is greater than -75 dbm, the signal is good.
Otherwise, adjust the antennas.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2
C O
N S
O L
E
0
E M
A IN
A
3 Hardware Installation
1
3
5
W iF
i 1
7
2
4
6
L T
E M
A IN
1 2
V
; 2
A
3
1
3
C O
N S
O L
E
5
W iF
i 1
0
7
2
4
6
L T
E M
A IN
1 2
V
; 2
A
262

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents