Hardware Guide
Figure 3-36 Installing the mounting ears on the chassis
Step 2 Install cabinet guide rails and floating nuts.
The USG supports the adjustable guide rails (parts 21241561 and 21242247) and L-shaped
guide rails. The installation method varies with the guide rail type.
1.
Issue 08 (2017-06-30)
S e
c o
s p
a c
e U
S G
6 0
0 0
0/ 1
S Y
2
S
P W
3
R
A L
M G
M
M T
H D
D
M O
M G
1
D E
M T
R S
0
0
T
1
2
3
4
C O
5
N S
O L
6
E
7
8
NOTE
Adjustable guide rails 21241561 are delivered earlier and no longer delivered after they run out. Then
adjustable guide rails 21242247 are delivered.
Determine the positions for installing the guide rails and floating nuts, as shown in
Figure
3-37,
Figure
3-38, and
NOTICE
Install the two guide rails at the same height to ensure that the device is level.
Figure 3-37 Positions of L-shaped guide rails and floating nuts
1U
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
9
1 0
1 1
Figure
3-39.
For floating nuts
(device nuts)
L bottom of the L-shape guide rail
3 Hardware Installation
M4
287