Huawei USG6000 Series Hardware Manual page 290

Version v100r001 & v500r001
Hide thumbs Also See for USG6000 Series:
Table of Contents

Advertisement

HUAWEI USG6000 Series
Hardware Guide
Step 2 Drill holes and install mounting screws.
Ensure that the mounting screws are secure and reliable. Otherwise, the tension after cables
are connected may cause the USG6310/6320 to fall.
1.
2.
3.
Step 3 Mount a USG on the wall by aligning the mounting brackets on the rear of the USG with the
mounting screws.
Issue 08 (2017-06-30)
NOTICE
Select a proper drill according to the outer diameter of mounting screws. The outer
diameter of mounting screws is not greater than 4 mm.
Hammer hollow wall anchors into the mounting holes.
Screw the mounting screws into the wall anchors using a Phillips screwdriver. Leave the
screws protruding 2 mm from the wall.
Figure 3-28 Drilling holes and installing mounting screws
6
25mm-30mm
4mm
NOTE
The USG supports upward mounting and downward mounting. To prevent water from entering into
ports and causing device damage, you are advised to mount the USG with ports facing downward.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
90
2mm
3 Hardware Installation
90
276

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents