SmartLogger2000
User Manual
Follow-up Procedure
Disconnection can be performed in reverse order.
4.5.3 Connecting the SUN2000 Through AC Power Cables
Context
The SmartLogger2000-10/10-B/10-C is integrated with the power line communication (PLC)
central coordinator (CCO) that can work with the SUN2000 integrated with the PLC station
(STA) to implement PLC networking over power cables.
Procedure
Step 1 Connect one end of the delivered AC power cables to an MCB.
Step 2 Connect the other end of the cable to the AC1 and AC2 ports on the SmartLogger
respectively.
Figure 4-12 Connecting AC power cables to the SmartLogger
Table 4-5
Table 4-5 Components
No.
1
Issue 04 (2018-04-10)
describes the components shown in
Component
Specifications
Busbar A/B/C
N/A
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
4-12.
4 Electrical Connection
Quantity
1