Chapter 2
Installing the Cisco MDS 9500 Series
S e n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a c k - d o c @ c i s c o . c o m .
Figure 2-4
1
1 Screws, 12-24 or 10-32
2 Support bracket

Installing the Cisco MDS 9509 Director in a Rack

Caution
If connecting a Cisco MDS 9509 Director to a 110-VAC power system, ensure that sufficient power is
provided to meet the chassis power requirements for the number of modules installed.
When connected to 220 VAC, the 2500-W AC power supplies (DS-CAC-2500W) for the Cisco MDS
9509 Director are designed to provide an output power of 2331 W to power the modules and fans. When
connected to a 110 VAC power system, the power supply provides approximately 1150 W. In this case,
and if the power supplies are used in redundant rather than combined mode, they might not provide
adequate power, depending on the number of modules loaded in the chassis.
If a 110-VAC input is chosen, a 110-VAC power cord (CAB-7513AC=) must be ordered separately.
Table 2-2
OL-17467-02
Installing the Cable Management Brackets on the MDS 9513 Chassis
3
4
lists the items provided in the Cisco MDS 9509 rack-mount kit.
Installing the Chassis in a Cabinet or Rack
2
3 Mounting rail
4 Cable guide
Cisco MDS 9500 Series Hardware Installation Guide