Cisco AJ732A - MDS 9134 Fabric Switch Installation Manual page 145

Cisco mds 9500 series hardware installation guide (ol-17467-02, october 2008)
Hide thumbs Also See for AJ732A - Cisco MDS 9134 Fabric Switch:
Table of Contents

Advertisement

Chapter 2
Installing the Cisco MDS 9500 Series
S e n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a c k - d o c @ c i s c o . c o m .
Figure 2-35
5
( )
1 PEM terminal block screws (+ and -)
2 Captive screw
3 Ring lug
If the PEM bay is to remain empty, install a PEM filler panel over the opening and tighten the captive
Step 4
screws to 8 in-lb.
OL-17467-02
Connecting or Disconnecting the DC PEM
( )
( )
4
3
Removing and Installing a Power Supply or PEM
( )
1
2
4 Stripped portion of positive cable
5 Insulated portion of negative cable
Cisco MDS 9500 Series Hardware Installation Guide
2-65

Advertisement

Table of Contents
loading

Table of Contents