Removing and Installing a Power Supply or PEM
S e n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a c k - d o c @ c i s c o . c o m .
To avoid damage to the panel fasteners, do not place the power supply down on the perforated ends. Place
Caution
the power supply down on the flat sheet metal sides or on the two brackets found on the rear of the power
supply.
Install a power supply filler panel over the opening and tighten the captive screws to 8 in-lb if the power
Step 8
supply bay that has to remain empty.

Installing an AC Power Supply in the Cisco MDS 9513 Director

Caution
Use both hands to install and remove power supplies. Each Cisco MDS 9513 AC power supply weighs
up to 34.2 lb (15.5 kg).
To avoid damage to the panel fasteners, do not place the power supply down on the perforated ends. Place
Caution
the power supply down on the flat sheet metal sides or on the two brackets found on the rear of the power
supply.
To install an AC power supply in the Cisco MDS 9513 Director, follow these steps:
Ensure that the system (earth) ground connection has been made. See the
Step 1
on page
If a filler panel is installed, remove the filler panel from the power supply bay by loosening the captive
Step 2
screw.
Ensure that the power switch is in the off (0) position on the power supply you are installing. (See
Step 3
Figure
Cisco MDS 9500 Series Hardware Installation Guide
2-54
2-17.
2-29.)
Chapter 2
Installing the Cisco MDS 9500 Series
"System Grounding" section
OL-17467-02

Advertisement

Table of Contents
loading

Table of Contents