Cisco ONS 15454 Manual page 62

Turning up a node
Hide thumbs Also See for ONS 15454:
Table of Contents

Advertisement

DLP-G314 Verifying OSCM Transmit Power
Stop. You have completed this procedure.
DLP-G314 Verifying OSCM Transmit Power
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Procedure
Step 1
Display the OSCM card in card view.
Step 2
Click the Provisioning > Optical Line > Parameters tabs.
Step 3
Record the Port 3 (OSC TX) Power value: _____.
Step 4
Change to node view (single-shelf mode) or multishelf view (multishelf mode), then click the Provisioning
> WDM-ANS > Provisioning tabs.
Step 5
Record the OSC Power value under the OSCM card in the tree view.
Step 6
If the power value recorded in
following steps. Otherwise, continue with
a) Click the Maintenance > ALS tabs. Verify that the ALS Command is set to OSRI Off. If not, choose Off
from the drop-down list. Click Apply, then click Yes.
b) Clean the optical connections.
c) Complete the following procedures:
Step 7
Return to your originating procedure (NTP).
Turning Up a Node
62
Step 3
• Delete the two OSC channels using the
• Complete the
NTP-G37 Running Automatic Node Setup
• Create the OSC channels using the
• Repeat
Step 3
through
Step
next level of support.
This task verifies that the transmit power of the OSCM
card is correct.
None
DLP-G46 Log into CTC
Required
Onsite or remote
Superuser only
is not within the range of +/– 0.5 dBm recorded in
Step
7.
DLP-G186 Delete an OSC Termination.
NTP-G38 Provisioning OSC Terminations
6. If the power level is still not within the specified range, contact your
Turning Up a Node
Step
5, complete the
procedure.
procedure.

Advertisement

Table of Contents
loading

Table of Contents