Turning Up a Node
Step 7
Repeat Steps 1 through 6 for each TXP, MXP, GE_XP, 10GE_XP, GE_XPE, 10GE_XPE, ADM-10G, or
OTU2_XP card that you want to connect to this patch panel.
Step 8
Return to your originating procedure (NTP).
NTP-G185 Installing Fiber-Optic Cables between Mesh Nodes
Purpose
NTP-G185 Installing Fiber-Optic Cables between Mesh Nodes
This procedure describes how to install fiber-optic
cables to create mesh nodes. You must route
fiber-optic cables from:
• 40-MUX-C and 40-DMX-C cards in a mesh node
to the 40-channel (80-port) patch panel tray
(15454-PP-80)
• 40-WXC-C or 80-WXC-C or 16-WXC-FS cards
in a mesh node to one of the mesh patch panel
trays (four-degree or eight-degree). The
16-WXC-C card uses the MF-DEG-5,
MF-UPG-4 passive modules for mesh nodes.
• 40-SMR2-C cards in a mesh node to the
15454-PP-4-SMR patch panel tray.
Turning Up a Node
49