DLP-G427 Rerouting Fiber-Optic Cables in the 40-Channel Patch Panel Tray
Required/As Needed
Onsite/Remote
Security Level
Procedure
Step 1
Carefully unwind all of the MPO cables in the patch panel tray and gently set the cables to the side of the tray,
out of the way of the internal hardware.
Figure 10: 40-Channel Patch Panel Tray, Side View
Turning Up a Node
44
As needed
Onsite
None
Turning Up a Node