Chassis Clearances

S e n d d o c u m e n t c o m m e n t s t o n e x u s 7 k - d o c f e e d b a c k @ c i s c o . c o m
Table A-14
Locale
All
Figure A-13
Chassis Clearances
You must provide adequate clearance for installing the switch, replacing switch modules, routing cables,
and allowing airflow to and from the switch.
This section includes the following topics:

Cisco Nexus 7009 Chassis Clearances

The Cisco Nexus 7009 chassis requires the following clearances:
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
A-14
6-kW DC Power Supply Power Cord
Part Number
N7K-DC-CAB
Power Connector for the 6.0-kW DC Power Supply Unit
Cisco Nexus 7009 Chassis Clearances, page A-14
Cisco Nexus 7010 Chassis Clearances, page A-15
Cisco Nexus 7018 Chassis Clearances, page A-15
If you are using a four-post rack or cabinet, you must have 7 inches (17.8 cm) between the chassis
and the front and back of a four-post rack or interior of the cabinet (required for cabling). This
requirement does not apply to a two-post rack.
Cord Rating
Power Cord Reference Illustration
40 A, 48V-48V
Figure A-13
Appendix A
Technical Specifications
OL-23069-06

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nexus 7009Nexus 7018Nexus 7010

Table of Contents