GE Masoneilan SVI II ESD Installation And Maintenance Manual page 62

Smart valve interface with sil3 emergency shutdown pst controller
Table of Contents

Advertisement

5. Slide the magnet holder into the extension shaft. The location of the magnets is in the ring
of the magnet holder. The magnetic axis is the imaginary line through the center of both
magnets.
6. Rotate the magnet holder so that the magnet axis is vertical when the valve is in the
closed position.
7. Align the end of the magnet holder flush with the end of the mounting bracket. Secure the
magnet holder with two M6 set screws.
8. Slide the V-Seal over the magnet holder.
9. Secure the SVI II ESD onto the mounting bracket using four M6 x 20 mm Socket Head Cap
Screws.
10. Ensure no interference exists with the position sensor protrusion.
11. Ensure that the V-Seal makes contact with the skirt around the position sensor protrusion
on SVI II ESD housing.
62 |