GE Masoneilan SVI II ESD Installation And Maintenance Manual page 151

Smart valve interface with sil3 emergency shutdown pst controller
Table of Contents

Advertisement

Sequence
Byte
Bit
#
#
8
5
VALVE_
STUCK_
OPENED
70
8
6
TMOUT_PST_
TEST
71
8
7
TMOUT_PNEU_
TEST
72
9
0
LATCH_AIR_
LOSS
73
© 2016 General Electric Company. All rights reserved.
Table 12 SVI II ESD Fault Matrix (Continued)
FAULT Name
Criticality
of Alarm
1
1
2
2
Auto-
Can be
Non-
mati-
cleared/
Mas-
cally
Persists
kable/
cleared
across
Annunci-
resets
ated
Yes
Yes/No
No/Yes
Yes
Yes/No
Yes/Yes
Yes
Yes/No
Yes/Yes
Yes
No/Yes
No/No
Masoneilan SVI II ESD Installation and Maintenance Manual
TEXT For
Probable Cause
DD &
English
ValVue
ESD2
English
Valve
1- A handwheel is
Stuck
left engaged.
Opened
2- Valve is seized
in place.
3- Exhaust port is
clogged up (no
venting).
4- An accessory
prevents the air
from the actuator
to be vented.
PST Out
PST hasn't been
of sched-
performed within
ule
time limit.
Pneu-
Pneumatic test
matic
hasn't been per-
test out
formed within
of sched-
time limit.
ule
Low Sup-
Latched due to
ply Pres-
Low Supply Pres-
sure
sure.
Latch
Supply pressure
below configured
threshold.
Recommended
Action
1- Verify presence
of a mechanical
stops such as a
handwheel.
2- Repair valve.
3- Verify that
exhaust port is
not restricted.
4- Run a Pneu-
matic Self Test
test from ValVue
ESD. A failure of
the Pneumatic
Self Test test
would indicate a
problem in vent-
ing.
If persists contact
GE.
Implemented for
firmware 3.1.6.
If persists contact
GE.
Implemented for
firmware 3.1.6.
Fix supply pres-
sure.
Implemented for
firmware 3.1.6.
| 151
=

Advertisement

Table of Contents
loading

Table of Contents