When the switch is on (closed) the external voltage must be dropped across the load
(Figure 74).
Load is designed to ensure that voltage across the switch is < 1 V.
Figure 74 Simplified Switch Installation Drawing: Correct Configuration
Without a load, when the switch is on (closed) the external voltage would be dropped across
the switch. This damages the switch (Figure 75).
Full voltage
drop is
occurring
across the
SVI II ESD
switch (no
Switch
current limit
Output
in place)
Figure 75 Simplified Switch Installation Drawing:
128 |
=GE Oil & Gas
The load must be designed such that the current in the circuit is
CAUTION

1 A at all times. Some 3rd party devices, such as incandescent
lamps or solenoids, require surge and back EMI protection to limit
current to
LOAD
SVI II ESD
Switch Output:
 1 V with
switch ON
NOT ALLOWED

1 A.
Configuration Not Allowed