Replacing An Imm-Only Node With Another Node - Nokia 7210 Configuration Manual

Service access switch 7210 sas-m, t, r6, r12, mxp, sx, s basic system
Hide thumbs Also See for 7210:
Table of Contents

Advertisement

Virtual Chassis
Step 7. If the replacement node is a new node, follow these steps.
Step 8. Save the BOF and let the boot proceed.
Services are not interrupted during the preceding process because the active CPM
(CPM-A) is present and has not been rebooted (assuming the active CPM has an
uplink to the network). If one of the IMM-only nodes was converted to a CPM-IMM
node, the services on that IMM are affected as the node is rebooted to effect the
change to a CPM-IMM node.

5.7.2 Replacing an IMM-only Node with Another Node

In this scenario, it is assumed that the IMM-only node has failed and needs to be
replaced. The replacement node can be a new node from the factory or a node that
has been previously used as an IMM node in another VC. In the former case, the
procedure is similar to adding a node received from factory; see
Boot of Nodes in the Stack
The SD card used to boot the node must contain a version of the TiMOS image
(boot.tim) that matches that of the active CPM. If the version do not match, the boot
will not be successful.
242
iii. Reboot the node by toggling the power button.
iv. On boot up, interrupt the boot process and configure the node as CPM-
IMM (CPM-B) by configuring the following BOF parameters:
• specify cpm-imm for vc-stack-node-type
• specify the slot number and MAC address of each CPM-IMM node
in the bof>vc-stack-node command
i. Physically connect the new node into the VC ring (the stacking ports
are connected to form a ring so that an alternate path always exists).
ii. Reboot the node.
iii. Connect to the console of the new node.
iv. Power on the node.
v. On boot up, interrupt the boot process and configure the node as CPM-
IMM node by configuring the following boot loader parameters:
• specify cpm-imm for vc-stack-node-type
• specify the slot number and MAC address of each CPM-IMM node
in the bof vc-stack-node command
The node comes up as a standby CPM node and talks to the active CPM
to start the HA synchronization process. The master LED on the standby
CPM will be blinking. The master LED on the active CPM will glow steady.
starting at Step 9.
© 2021 Nokia.
Use subject to Terms available at: www.nokia.com
7210 SAS-M, T, R6, R12, Mxp, Sx, S Basic System
Configuration Guide
First Time Manual
3HE 17358 AAAB TQZZA

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7210 sas-mxp7210 r67210 r127210 s7210 sx7210 t

Table of Contents