4.4 Commissioning Monitoring Devices

4.4.1 Commissioning the Access Control System

Prerequisites
Preparations
Tools: step ladder, Phillips screwdriver
Documents: monitoring and fire extinguishing drawings and parameters
Skill requirement: ELV engineer familiar with the management system
Procedure
Step 1 Open the magnetic lock of the main entrance door by swiping an access card.
Step 2 Rotate the door handle clockwise and pull the main entrance door.
Step 3 Enter the pre-fab. module and close the main entrance door.
Step 4 For the main entrance door, press the exit button and push the door lever to open
the door. For the emergency door, push the door lever to open the door.
Step 5 Check the main entrance door event or emergency door alarm event in the
management system.
Step 6 Insert the key delivered with the emergency door release button into the test hole
to control the emergency door release button, and rotate the door handle
clockwise. If the door of the pre-fab. module can be opened, the emergency door
release button functions properly.
----End
Issue 01 (2021-04-20)
You have powered on the access control system.
You have configured the IC cards.
NO TE
If you do not open the main entrance door within 6s after swiping the card, the magnetic
lock will lock the door again.
NO TE
Normal response: The main entrance module door can be opened, and the management
system logs the door opening event.
NO TE
Normal response: The pre-fab. module door can be opened, and the management system
logs the door opening event.