3.4 Check Before Power-On

Preparations
Tools: multimeter, screwdriver, step ladder, insulation megohmmeter, pressure
gauge
Documents: solution drawings and parameters
Skill requirement: power distribution engineer
Issue 01 (2021-04-20)
Personnel Skill Requirement
With knowledge in the hardware and software of the
prefabricated data center, familiar with basic
communications protocols, familiar with equipment
interfaces in extra-low voltage (ELV) systems, and proficient
in operating the NetEco management system
With ELV engineer qualifications
Familiar with the fire extinguishing system configurations
and the operations for each core device in the FusionDC1000
With fire protection engineer qualifications
Familiar with the overall configurations and layout of the
FusionDC1000
Experienced in data center maintenance
Copyright © Huawei Technologies Co., Ltd.
3 Preparations for Power-On Commissioning
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r021c00

Table of Contents