FusionDC1000A Prefabricated All-in-One Data
Center
Commissioning Guide (IT Scenario)
3.
4.
5.
----End
4.7.2.8 Process of adding a device
Prerequisites
●
●
Interface Introduction
Figure 4-12 Adding a device
Issue 01 (2021-04-20)
Tap Communication to set IP address assign to Automatic(DHCP) on the
displayed communication settings screen and the SmartLi is discovered by
ECC800-Pro automatically and is connected to the ECC800-Pro.
After the ECC800-Pro is directly identified and connected, set the lithium
battery view on the ECC800-Pro WebUI.
Drag Lithium Battery Cabinet1 to the gray area to the right of the UPS.
Figure 4-11 Configuring the lithium battery cabinet
You have logged in to the NetEco client using a web browser.
You have the operation rights for Data Center Planning.