Huawei FusionDC1000B Quick Manual

Prefabricated modular data center
Hide thumbs Also See for FusionDC1000B:

Advertisement

Quick Links

FusionDC1000B Prefabricated Modular Data
Center
Quick Guide (2021, Saudi, ITC)
Issue
01
Date
2021-01-11
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei FusionDC1000B

  • Page 1 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2021, Saudi, ITC) Issue Date 2021-01-11 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    FusionDC1000B Prefabricated Modular Data Center Quick Guide (2021, Saudi, ITC) About This Document About This Document Purpose This document describes the initial configuration parameters of the data center, as well as the installation precautions, processes, parameters, and drawings. It helps...
  • Page 4 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2021, Saudi, ITC) About This Document Symbol Description Indicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results. NOTICE is used to address practices not related to personal injury.
  • Page 5: Table Of Contents

    FusionDC1000B Prefabricated Modular Data Center Quick Guide (2021, Saudi, ITC) Contents Contents About This Document........................ ii 1 Quick Guide Usage........................1 2 Installation Guide........................3 2.1 Installing a 13.5 kW Integrated Air Conditioner......................3 2.2 Connecting Cables to the 13.5 kW Integrated Air Conditioner................7 3 Installation Drawings......................
  • Page 6: Quick Guide Usage

    This chapter describes the notes for using the quick guide. ● Before the installation, check whether the materials are intact according to the packing list. If there is any problem, contact Huawei technical support. ● This document provides only the initial configuration parameters required for data center commissioning and O&M as well as the drawings and parameters...
  • Page 7 Table 1-1 Reference Documentation (List the component documents based on the actual configuration of the project.) Item Document Name FusionDC1000B Prefabricated Modular Data Center V100R021C00 FusionMod Installation Guide FusionDC1000B Prefabricated Modular Data Center V100R021C00 Commissioning Guide...
  • Page 8: Installation Guide

    FusionDC1000B Prefabricated Modular Data Center Quick Guide (2021, Saudi, ITC) 2 Installation Guide Installation Guide 2.1 Installing a 13.5 kW Integrated Air Conditioner Prerequisites Four installation positions are reserved at the pre-fab. module. Select four installation positions based on the site requirements.
  • Page 9 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2021, Saudi, ITC) 2 Installation Guide Figure 2-2 Cover positions (1) Air exhaust vent cover (2) Connection box cover (3) Air intake vent cover Use a Phillips screwdriver to remove the screws reserved on the cover of the connection box from the outside of the pre-fab.
  • Page 10 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2021, Saudi, ITC) 2 Installation Guide Remove the connection box cover. Figure 2-5 Removing the connection box cover Remove the screws at the air intake and exhaust vents inside the pre-fab. module using a Phillips screwdriver, and cut off the glue attached to the cover using a utility knife.
  • Page 11 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2021, Saudi, ITC) 2 Installation Guide Step 3 Install two bolts on the outdoor side wall to hang the device. Figure 2-8 Pre-installing two bolts Step 4 Hoist the 13.5 kW integrated air conditioner to the installation position using a crane and mount it on the two bolts that have been installed.
  • Page 12: Connecting Cables To The 13.5 Kw Integrated Air Conditioner

    FusionDC1000B Prefabricated Modular Data Center Quick Guide (2021, Saudi, ITC) 2 Installation Guide Step 6 After the screws are tightened, apply waterproof sealant on the flange edges of the air conditioner and around the screws, and ensure that the sealant is applied continuously and neatly.
  • Page 13 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2021, Saudi, ITC) 2 Installation Guide Symbol Meaning Alarm dry contact, normally closed (NC) Alarm dry contact, common (COM) Alarm dry contact, normally open (NO) CA UTION Ports 1 and 2 receive only passive (non-energized) switch signals. If active (energized) signals are received, components inside the unit will be burnt.
  • Page 14: Installation Drawings

    FusionDC1000B Prefabricated Modular Data Center Quick Guide (2021, Saudi, ITC) 3 Installation Drawings Installation Drawings Issue 01 (2021-01-11) Copyright © Huawei Technologies Co., Ltd.
  • Page 15 Checklist of Devices Installed Onsite Installation Sequence Subcategory Item Corresponding Chapter in Installation Guide Diagram ID Diagram Name Concrete Podium Installation Determining the Pre-fab. Module Installation Determining the Pre-fab. Module Installation NO.S003 Concrete Podium Position Diagram Solution Position Position Removing the Transport Protection Removing the Transport Protection Cover Removing the Transport Protection Cover Cover...
  • Page 16 Installation Sequence Subcategory Item Corresponding Chapter in Installation Guide Diagram ID Diagram Name Installing Eaves Installing Eaves Installing Eaves External Accessories Installation Position Installing an Awning Installing an Awning Installing an Awning NO.S009 Diagram Installing External Accessories Installing Fire Hammers for Pre-fab. Installing Fire Hammers for Pre-fab.
  • Page 17 Installation Sequence Subcategory Item Corresponding Chapter in Installation Guide Diagram ID Diagram Name Connecting Fire Connecting Fire Control Cables Inside Fire Extinguishing System Onsite Wiring NO.F005 Extinguishing Cables Functional Zones Diagram Connecting Monitoring Cables Inside Connecting Monitoring Cables NO.M003 Monitoring Onsite Wiring Diagram Functional Zones Connecting the Light Power Cable NO.P011...
  • Page 18 No.S003 Concrete Podium Position Diagram Steel base 500 mm-high concrete podium Prefabricated concrete floor 6058 2940 2940 2940 1. The horizontal error between concrete podiums must be less than 5 mm. 2. Concrete pads or passages with the bearing capacity meeting local civil work standards can be built on the field outside the concrete podiums for access and maintenance.
  • Page 19 No.S004 Pre-fab. Module Combination Diagram...
  • Page 20 No.S005 Pre-fab. Module Securing Position Diagram Steel base 500 mm-high concrete podium Prefabricated concrete floor 6058...
  • Page 21 No.S006 External Sealing Material Installation Position Diagram External sealing for combined pre-fab. modules GB9074_4-88_M4X12_S GB9074_17-88_M10X40_S_ZNAL DKBA80837291 DKBA80261099 DKBA81373140 DKBA04853056_1850.prt DKBA04853091_6150X550_F1...
  • Page 22 No.S007 Installation Position Diagram for Internal Pre-fab. Module Combination Materials 1 Internal sealing for combined Armaflex thermal insulation pipe pre-fab. modules Thermal insulation foam (double layers) Top sealing plate (secured using Armaflex thermal insulation pipe Thermal insulation foam DKBA80998528 DKBA81107072 GB12617_4-2006_4X10_S DKBA81373131 DKBA81373143...
  • Page 23 No.S007 Installation Position Diagram for Internal Pre-fab. Module Combination Materials 2 Bottom floor sealing for combined pre-fab. modules GGB819-85_M4X8 DKBA81373147...
  • Page 24 No.S008 Pre-fab. Module Grounding Position Diagram Pre-fab. module ground point Pre-fab. module ground point Pre-fab. module ground point Pre-fab. module ground point GB5783-2000_M12X30_S_ZNAL Screw GB5783-2000_M12X30_S_ZNAL...
  • Page 25 No.S009 External Accessories Installation Position Diagram Note: 1. After installing eaves and rain and snow covers, apply glue around them.
  • Page 26 No.S010 External Cable Connector Installation Position Diagram Remove the waterproof protective cover.
  • Page 27 No.S011 Air conditioner installation position diagram Air conditioner (delivered with screws) Note: 1. After air conditioners are installed, apply glue around them. Remarks...
  • Page 28 No.S012 External cable tray support installation position diagram Secure the cable tray using two GB9074_17-88_M10X40_S_ZNAL above the tray. Secure the cable tray using two under the tray. Cable tray GB5783-2000_M16X50_S_ZNAL GB9074_17-88_M10X40_S_ZNAL...
  • Page 29 No.F004 Fire Extinguishing Device Installation Position Diagram EXIT CT Rack CT Rack Install extinguishant control panel batteries onsite. CT Rack CT Rack CT Rack Install the outdoor horn strobe onsite. 52L/48KG EXIT Pack the fire cylinder and install it onsite, connect cables to the electrical actuator, bind it to the cable tray, and install it onsite.
  • Page 30 No.S013 Position Diagram for Internal Cable Trays Between Combined Pre-fab. Modules Connecting piece 50:1 GB9074_13-88_M6X16.PRT Screw GB6170-86_M6.PRT DKBA61584438 Cable tray connecting piece DKBA81185704 Single-layer 400 mm wide cable tray DKBA81185708 Double-layer 400 mm wide cable tray DKBA81185702 200 mm wide cable tray 300 mm wide cable tray DKBA80178360 Remarks...
  • Page 31 No.P005 DC Power System Output Wiring Diagram...
  • Page 32 No.P006 Diagram of Cable Connection Between the DC Power System and the Battery Cabinet...
  • Page 33 No.P007 DC Power System Rectifier Installation Diagram Procedure Step 1 Push the locking latch towards the upwards. Step 2 Draw the handle downwards. Step 3 Gently push the rectifier into its slot along the guide rails. Step 4 Push the handle left. Step 5 Push the locking latch towards the downward to secure the handle.
  • Page 34 No.P008 DC Power System Rectifier Installation Position Diagram (1) AC input box (2) Cabinet ground bar (3) Load fuses (4) SMU02C (5) Reserved installation space for CIM02C (6) Space for rectifiers (7) Rectifier circuit breakers (8) Battery fuses (9) MDU (10) User Interface Module UIM03F1 (11) AC SPD and SPD circuit breaker...
  • Page 35 No.P009 Battery Module Installation Position Diagram (1) RTN+ copper bar (3) Space for batteries...
  • Page 36 No.F005 Fire Extinguishing System Onsite Wiring Diagram Horn Strobes -2 Horn Strobes -1 Terminal Resistor black - + + - + + Outdoor horn strobe cable connection: Electrical actuator onsite installation Align the Connect the two black cables to the leftmost binding post, and connect the two electrical actuator and the container valve, and red cables to the rest two binding posts respectively.
  • Page 37 No.M003 Monitoring Onsite Wiring Diagram (Access Control Subsystem) Symmetrical twisted pair cable Electronic power cable CT Rack CT Rack CT Rack CT Rack CT Rack Abort Emergency door release button cable, reserved behind the outdoor fire alarm horn strobe and connected using an interconnection terminal T&H-B2 Connect terminals to the cables,...
  • Page 38 No.M003 Monitoring Onsite Wiring Diagram (Cooling Subsystem) Symmetrical twisted pair cable Electronic power cable CT Rack CT Rack CT Rack CT Rack CT Rack Abort Connect terminals to the cables, T&H-B2 label the cables, and reserve the T&H-B1 cables on the cable trays in A1. Connect the cables to B1 onsite.
  • Page 39 No.M003 Monitoring Onsite Wiring Diagram (Fire Extinguishing Subsystem) CT Rack CT Rack Symmetrical twisted pair cable CT Rack CT Rack CT Rack Abort Electronic power cable T&H-B2 T&H-B1 Connect terminals to the cables, UIM20A-B1 label the cables, and reserve the cables on the cable trays in A1.
  • Page 40 No.M003 Monitoring Onsite Wiring Diagram (Power Distribution Subsystem) CT Rack CT Rack CT Rack CT Rack CT Rack Abort T&H-B2 T&H-B1 UIM20A-B1 Symmetrical twisted pair cable Electronic power cable...
  • Page 41 No.M003 Monitoring Onsite Wiring Diagram (Video Surveillance Subsystem) Symmetrical twisted pair cable CT Rack CT Rack Electronic power cable CT Rack CT Rack CT Rack Abort T&H-B2 Connect terminals to the camera T&H-B1 cables, label the cables, and reserve UIM20A-B1 the cables on the cable trays in B1.
  • Page 42 Cable Relation Table Terminal Relation Table INPUT OUTPUT Terminal Spec From Terminal Spec From Power System Huawei Part Description Cable No. Breaker Part 1 Part 2 Container From Device Container To Device...
  • Page 43 Cable Relation Table Terminal Relation Table INPUT OUTPUT Terminal Spec From Terminal Spec From Cable No. Breaker Power System Huawei Part Description Part 1 Part 2 Container From Device Container To Device 14170214 14170214 Main PDB QF10...
  • Page 44 Cable Relation Table Terminal Relation Table INPUT OUTPUT Terminal Spec From Terminal Spec From Power System Huawei Part Description Cable No. Breaker Part 1 Part 2 Container From Device Container To Device...
  • Page 45 Cable Relation Table Terminal Relation Table INPUT OUTPUT Terminal Spec From Terminal Spec From Power System Huawei Part Description Cable No. Breaker Part 1 Part 2 Container From Device Container To Device Rectifier Cabinet...
  • Page 46 Cable Relation Table Terminal Relation Table INPUT OUTPUT Terminal Spec From Terminal Spec From Power System Huawei Part Description Cable No. Breaker Part 1 Part 2 Container From Device Container To Device...
  • Page 47 Cable Relation Table Terminal Relation Table INPUT OUTPUT Terminal Spec From Terminal Spec From Cable No. Breaker Power System Huawei Part Description Part 1 Part 2 Container From Device Container To Device 14170214 14170214 Tube-1.5mm Tube-1.5mm...
  • Page 48: Removing Transport Protection Materials

    FusionDC1000B Prefabricated Modular Data Center Quick Guide (2021, Saudi, ITC) 4 Removing Transport Protection Materials Removing Transport Protection Materials Table 4-1 Transport protection materials to be removed Device Protection Materials to Be Removed Smart cooling product Transport fastener for the compressor and...
  • Page 49: Initial Configuration Parameters

    FusionDC1000B Prefabricated Modular Data Center Quick Guide (2021, Saudi, ITC) 5 Initial Configuration Parameters Initial Configuration Parameters Issue 01 (2021-01-11) Copyright © Huawei Technologies Co., Ltd.
  • Page 50 List of Initial Configuration Parameters Category Diagram ID Diagram Name Detailed Initial Configuration Parameters Power Supply and Distribution Device NO.P001 Layout Diagram Power Supply and Distribution System NO.P002 Diagram Initial Configurations for the Power Supply ABB 8D ATS Initial Configuration Parameters and Distribution System Initial Configuration Parameters for Table 1...
  • Page 51 No.P001 Power Supply and Distribution Device Layout Diagram CT Rack CT Rack CT Rack CT Rack CT Rack CT Rack CT Rack CT Rack CT Rack CT Rack CT Rack CT Rack CT Rack CT Rack WETER...
  • Page 52 No.P002 Power Supply and Distribution System Diagram 380V~ 380V~ 380V~ 50/60Hz 50/60Hz 50/60Hz Main L1/L2/L3/N/PE L1/L2/L3/N/PE L1/L2/L3/N/PE MTS/250A/4P ATS 250A/4P Rectifier...
  • Page 53 Table 1 Initial Configuration Parameters for Power Supply and Distribution Devices Device Name Project Configuration Quantity Power Distribution Device Name Remarks 8D ATS ■Involved □Not involved Main PDB SMU05A ■Involved □Not involved Rectifier Note: The following device parameters are not all parameters of the devices. Only the parameters that need to be set for the project are listed. Default values will be used for the other parameters so they do not need to be set.
  • Page 54 Component Main PDB ABB 8D ATS Initial Configuration Parameters Category Parameter Default Value Value Range Setting Remarks Password 0001 Default Value 100/57 V-115/66 V-120/70 V-208/120 V-220/127 V- Rated Voltage 400/230 V 230/132 V-240/138 V-277/160 V-347/200 V-380/220 380 V V-400/230 V-415/240 V-440/254 V-480/277 V Rated Frequency 50 Hz 50 Hz, 60 Hz...
  • Page 55 Category Parameter Default Value Value Range Setting Remarks Volt Hysteresis –8% –29% to –4%, step 1% –8% Min LN1 Volt Hysteresis –8% –29% to –4%, step 1% –8% Min LN2 Voltage Hysteresis Volt Hysteresis +4% to +29%, step 1% Max LN1 Volt Hysteresis +4% to +29%, step 1% Max LN2...
  • Page 56 Category Parameter Default Value Value Range Setting Remarks Switching 0–60s Dead Band I to II 0–60s Back Switching 0s, 1s...59s, 1 min, 2 min…90 min Delay Times Device Configuration Dead Band II to I 0–60s Delay on 0s, 1s...59s, 1 min, 2 min…10 min Transfer Generator Stop 0s, 1s...59s, 1 min, 2 min...30 min...
  • Page 57 Component Rectifier SMU05A DC Power System TP483000D/TP482000B/TP481200B Initial Configuration Parameters Category Parameter Default Value Value Range Setting Remarks Local Parameters Language Chinese/English English Chinese Parameters Settings Installation Time Installation Time 2012/1/1 Current date Set by service personnel Battery Group Basic Parameters Charge Limit Coef 0.10C10 0.05–0.25...
  • Page 60 Table 2 Initial Configuration Parameters for Cooling Devices Initial Temperature Configuration Parameters for 13 kW Air Conditioner Fresh Air Integrated Units Air Conditioner Cool SP Cool Sens Cool Ctrl Type Dehum SP Air Conditioner-A1 Air Conditioner-A2 Air Conditioner-A3 Rtn Avg Air Conditioner-B1 Air Conditioner-B2 Air Conditioner-B3...
  • Page 61 Initial Teamwork Configuration Parameters for 13 kW Air Cooled Precision Air Conditioners Air conditioning Team Local Addr Monitor Addr Mode MenberQty StandbyQty Polling Time number Single/Team Auto Single/Team Auto Single/Team Auto Single/Team Auto Single/Team Auto Single/Team Auto...
  • Page 62 No.M001 Monitoring Device Layout Diagram Cameras are purchased and installed locally. CT Rack CT Rack DOOR EXIT BREAK GLASS CT Rack CT Rack CT Rack Abort T&H-B2 T&H-B1 UIM20A-B1 Install the VCN510 onsite. Cameras are purchased and installed locally. Cameras are purchased and installed locally.
  • Page 63 Monitoring System Network Diagram No.M002 Reserved Reserved Reserved Reserved Reserved Reserved Reserved Reserved Reserved Reserved Rectifier Reserved LAN Switch-B1 Reserved IP Camera -A1 Reserved IP Camera -B1 Reserved IP Camera -B2 Reserved VCN510-B1 Reserved Reserved Reserved Reserved T&H-B1 T&H-B2 FAULT RELAY-A1 Extinguishant Control Panel-A1 LOCAL FIRE-A1 ECC800 BACK...
  • Page 64 Table 3 Initial Configuration Parameters for the Management System Port to Upper- WebUI User Pre-fab. Monitoring Data Device IP Device LCD User Name Upper- Level Device Code Device Name Device Model Alarm Threshold Name and Transfer Upper-Level Device Remarks Module Device Type Address...
  • Page 65 Port to Upper- WebUI User Pre-fab. Monitoring Data Device IP Device LCD User Name Upper- Level Device Code Device Name Device Model Alarm Threshold Name and Transfer Upper-Level Device Remarks Module Device Type Address Address and Password Level Device Password Port Device Port...
  • Page 66 Port to Upper- WebUI User Pre-fab. Monitoring Data Device IP Device LCD User Name Upper- Level Device Code Device Name Device Model Alarm Threshold Name and Transfer Upper-Level Device Remarks Module Device Type Address Address and Password Level Device Password Port Device Port...
  • Page 67 Remarks Number of hard disks configured for the VCN510: 1 Optional Functions of the NetEco Software Function Configured or Not Required or Not Client authorization Work order management Energy efficiency management Northbound SNMP interface for alarms Northbound SNMP interface for performance data Capacity management Mobile app O&M Temperature map...
  • Page 68 No.F001 Fire Extinguishing Device Layout Diagram EXIT CT Rack CT Rack CT Rack CT Rack CT Rack Abort EXIT...
  • Page 69 No.F002 Fire Extinguishing System Conceptual Diagram 1 Horn Strobes Horn Strobes Terminal Resistor - + + - + + Warning Signs-A1 Terminal Resistor Terminal Resistor 6.8K 6.8K 2WIRE SILENCE SILENCE COMM+ LEV1 LEV2 COMM+LEV1 LEV2 2WIRE Terminal Resistor pneumatic switch-B1 Fire Alarm Bell-A1 Extinguishant Abort Button To Monitoring system...
  • Page 70 No.F002 Fire Extinguishing System Conceptual Diagram 2 Smoke Detector-B3 Smoke Detector-B2 Smoke Detector-B1 L1 IN L1 IN L1 IN L1 OUT L1 OUT L1 OUT L1 OUT black black black black Heat Detector-B3 Heat Detector-B2 Heat Detector-B1 L1 IN L1 IN L1 IN L1 OUT L1 OUT...
  • Page 71 No.L001 Lighting Device Layout Diagram CT Rack CT Rack CT Rack CT Rack CT Rack CT Rack CT Rack CT Rack CT Rack CT Rack CT Rack CT Rack CT Rack CT Rack...
  • Page 72 No.F003 Emergency Exit Diagram CT Rack CT Rack CT Rack CT Rack CT Rack Exit...
  • Page 73: A Common Torque Selection Table

    FusionDC1000B Prefabricated Modular Data Center Quick Guide (2021, Saudi, ITC) A Common Torque Selection Table Common Torque Selection Table NO TE This table lists only the recommended torques for common screws, bolts, and pipe connectors. The torques you choose should meet project requirements.
  • Page 74 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2021, Saudi, ITC) A Common Torque Selection Table Item Tightening Torque (Tolerance: ±10%)/ (Unit: Kgf.cm) Cross Electric recessed screwdriv pan head thread forming screw Cross Pneumati recessed counters screwdriv unk head wood screw...
  • Page 75 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2021, Saudi, ITC) A Common Torque Selection Table Item Tightening Torque (Tolerance: ±10%)/ (Unit: Kgf.cm) ST4.8 Cross Pneumati 30 (for recessed checking, pan head screwdriv not for self- tightenin drilling tapping screw ST6.3...