Table 5-19 Function commissioning
Check Method
Path: Monitoring > Aisle > AC Actuator Group >
AC Actuator n
1. Choose Running Parameters, set Set light mode
2. Choose Controls, select Light control, select
----End
Follow-up Procedure
Set Set light mode is Automatic.

5.5 Commissioning Sensors

5.5.1 Commissioning a Multi-functional Sensor

If a multi-functional sensor is installed, perform the following steps to configure it.
Procedure
Step 1 Set multi-functional sensor parameters.
On the WebUI, choose Monitoring > Aisle > Multi-Func Sensor Group > Multi-Func
Sensor1 > Running Parameters, ensure that Smoke enable and Temp enable are set to
Enable, set High temperature alarm threshold and other parameters as required, and then
click Submit.
Step 2 Check the functions of the multi-functional sensor.
Table 5-20 Function commissioning
Check Method
Temperature and humidity
detection: View the running
information about the
multi-functional sensor on the
WebUI.
Smoke detection: Simulate a
smoky environment.
Smoke generation methods:
Issue 07 (2020-03-16)
is Manual.
ON, and click Submit.
If multiple multi-functional sensors are connected, commission one multi-functional sensor first and
then commission the other multi-functional sensors in the same way.
Copyright © Huawei Technologies Co., Ltd.
Normal Connection Status
The light is on.
Normal Connection Status
You can view the current ambient temperature and
humidity.
Start counting time immediately when smoke is
entering the hole. After about 30 seconds, the red
ALM indicator turns on, and the app or WebUI
5 Power-On Commissioning