Introduction
Setup and Configuration
Additional Information
2
Setting up a complete ACUIX system typically includes the following steps:
1. Installing the mount, adapter, or bracket to which the housing will be
attached.
2. Connecting the field wiring to the interface board inside the housing.
3. Installing the housing to the mounting surface.
4. Configuring the dome address, protocol, baud rate, and parity settings on
the scan assembly interface board.
5. Installing the scan assembly in the housing.
6. Installing the bubble.
7. Configuring additional dome settings remotely using the OSD menu.
The protocol and address settings of the dome are configured using DIP
switches located on the scan assembly. All other dome settings—such as
presets, preset tours, mimic tours, and privacy zones—are programmed using
OSD menus. A monitor and a controller are required to access the OSD.
For the latest product information and documentation, visit the ACUIX PTZ dome
web page at www.honeywellvideo.com/products/cameras/pt/103879.html.
The product page contains downloadable PDF versions of data sheets, quick
references, installation and user guides, A&E specifications, product notices,
and other related documents.