1 • Installation and Setup
1.1 Unpacking Procedures
1.2 Handling Precautions
This chapter describes the unpacking, handling, installation and front panel of the
SBC622.
Any precautions found in the shipping container should be observed. All items
should be carefully unpacked and thoroughly inspected for damage that might
have occurred during shipment. The board(s) should be checked for broken
components, damaged printed circuit board(s), heat damage and other visible
contamination. All claims arising from shipping damage should be filed with the
carrier and a complete report sent to GE Customer Care.
CAUTION
Some of the components assembled on GE's products may be sensitive to
electrostatic discharge and damage may occur on boards that are subjected to
a high energy electrostatic field. When the board is placed on a bench for
configuring, etc., it is suggested that conductive material be inserted under the
board to provide a conductive shunt. Unused boards should be stored in the
same protective boxes in which they were shipped.
Installation and Setup 21
.