Installation And Setup; Unpacking Procedures; Handling Precautions - GE OpenVPX VPXcel6 SBC622 Hardware Reference Manual

6u vpx, designed to meet the european union eu restrictions of hazardous substance rohs directive 2002/95/ec current revision
Table of Contents

Advertisement

1 • Installation and Setup

1.1 Unpacking Procedures

1.2 Handling Precautions

This chapter describes the unpacking, handling, installation and front panel of the 
SBC622.
Any precautions found in the shipping container should be observed. All items 
should be carefully unpacked and thoroughly inspected for damage that might 
have occurred during shipment. The board(s) should be checked for broken 
components, damaged printed circuit board(s), heat damage and other visible 
contamination. All claims arising from shipping damage should be filed with the 
carrier and a complete report sent to GE Customer Care. 
CAUTION
Some of the components assembled on GE's products may be sensitive to
electrostatic discharge and damage may occur on boards that are subjected to
a high energy electrostatic field. When the board is placed on a bench for
configuring, etc., it is suggested that conductive material be inserted under the
board to provide a conductive shunt. Unused boards should be stored in the
same protective boxes in which they were shipped.

Installation and Setup 21

.

Advertisement

Table of Contents
loading

Table of Contents