Preparing For Installation; Unpacking And Inspecting The Module; Equipment And Tools Needed - Cisco Prisma II HD-LRMW Installation And Operation Manual

1.2 ghz high density long reach multiwave and hybrid modulation qam transmitters
Table of Contents

Advertisement

Chapter 2
Module Installation

Preparing for Installation

Before you begin, make sure that the module is in good condition and that
you have the tools and equipment listed here.

Unpacking and Inspecting the Module

As you unpack the module, inspect it for shipping damage. If you find any
damage, contact Cisco Services. Refer to Customer Information (on page 91)
for contact information.

Equipment and Tools Needed

Before you begin, make sure that the module is in good condition. You need
the following equipment and tools to install these modules.
You need . . .
A standard Prisma II Chassis with power
supply
A 3/8-in. flat-blade screwdriver
A 7/16-in. open-end wrench
One RF cable with connectors
14
To . . .
Provide housing, power, and input and
output connections to the module.
Secure the module in the chassis.
Secure RF cable connectors at the chassis.
Carry RF input signals.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Prisma ii hqt

Table of Contents