Chapter 2 Module Installation
Preparing for Installation
Before you begin, make sure that the module is in good condition and that you have
the tools and equipment listed here.
Equipment and Tools Needed
Before you begin, make sure that the module is in good condition. You need the
following equipment and tools to install these modules.
You need . . .
a Prisma II or Prisma II XD Chassis with
power supply
3/8-in. flat-blade screwdriver
optical cables with connectors
optical cleaning materials
optical power meter
spectrum analyzer (for transmitter)
Unpacking and Inspecting the Module
As you unpack the module, inspect it for shipping damage. Inspect the rear
connectors for bent pins.
If you find any damage, contact Customer Service. Refer to Customer Support
Information (on page 99) for information on contacting Customer Service.
14
To . . .
provide housing, power, and input/output
connections to the module.
secure the module in the chassis.
carry optical input and output signals.
clean optical connectors.
verify optical input and output levels.
verify proper RF input.
78-4019959-01 Rev D