Site Requirements; Access Requirements; Equipment Rack; Operating Environment - Cisco Prisma II HD-LRMW Installation And Operation Manual

1.2 ghz high density long reach multiwave and hybrid modulation qam transmitters
Table of Contents

Advertisement

Site Requirements

Before you begin, be sure that your installation site meets the requirements
discussed in this section.

Access Requirements

Ensure that only authorized personnel have access to this equipment.
Otherwise, personal injury or equipment damage may occur.
WARNING:
Use this product in locations that restrict access to all persons who are not
authorized. Otherwise, personal injury or equipment damage may occur.

Equipment Rack

To install the modules, your site should be equipped with an Electronics
Industry Association (EIA) equipment rack that properly houses the Prisma II
Chassis with proper spacing for air circulation. For instructions on installing
the chassis in the rack, refer to the guide that was shipped with the chassis.

Operating Environment

CAUTION:
Avoid damage to this product! Operating this product outside the specified
operating temperature limits voids the warranty.
Follow these recommendations to maintain an acceptable operating
temperature:
Temperature inside the rack must be between 0°C and 50°C (32°F and 122°F)
¾
Keep cooling vents clear and free of obstructions.
¾
Provide ventilation, as needed, using one or more of the following methods:
¾
- Air-deflecting baffles
- Forced-air ventilation
- Air outlets above enclosures
Site Requirements
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Prisma ii hqt

Table of Contents