Installing The Hd Module In The Chassis; To Install The Transmitter Modules In The Host Module - Cisco Prisma II HD-LRMW Installation And Operation Manual

1.2 ghz high density long reach multiwave and hybrid modulation qam transmitters
Table of Contents

Advertisement

Installing the HD Module in the Chassis

To Install the Transmitter Modules in the Host Module

Note:
All Prisma II high-density application modules must be installed in a host
¾
module before they can be mounted in a standard Prisma II Chassis.
Prisma II host modules prior to Rev C (date codes through A2006) do not
¾
support the Controller Area Network (CAN) bus.
To support CAN bus redundancy, the ICIM2 must be Rev B or later.
¾
Complete the following steps to install the application modules in the host
module:
Align the ridges on the top and bottom of the module with the guide slots
1
located on the host module and the chassis. Be careful to keep the module
level as you slide it into the host to avoid bending the pins on the host
back plane.
Gently slide the module into the host module until you feel the power and
2
communications connections on the back of the module join connectors on
the host module. Use the thumbscrew on the top of the module to lock it
in place.
Installing the HD Module in the Chassis
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Prisma ii hqt

Table of Contents