3.11 Moving to a New Site

Before moving the Vertex M to a new site, use the
following procedures to prevent loss of data or damage
to the monitor.
1. Remove all Chemcassette
as required by local policies.
2. Exit the Vertex M program. Touch Project and
then Stop Project.
3. Back up data and configuration files. See
Section 5.10 File
4. Open the front door and set all power switches to
"Off".
5. Disconnect electrical supply at the source and
then disconnect from the power terminal in
the side of the cabinet.
6. Disconnect sample lines and cap lines as
required by local policies also cap Vertex M
inlet points.
7. Disconnect exhaust line and cap line as
required by local policies.
8. Disconnect alarm relays.
WARNING
Hazardous voltages may exist at the Alarm
Contacts in this unit with the power switch
turned off. Insure power is disconnected at
the source prior to servicing alarm contacts.
Crate and pad the Vertex M to prevent damage during
transport. If unsure of packing requirements, contact
the Honeywell Analytics Service department.
Section 3 - Startup
tapes and store
®
Maintenance.
CAUTION
Leaks in the exhaust tubing connection can cause
exposure to toxic gases from remote sample areas.
For leak-tight connections, follow the instructions in the
Installing Pump Exhaust Line section and the Remove
Pump section. With the system running, verify the leak
integrity with a small amount of leak test fluid.