Vertex M
24-Point Continuous Monitor
TM
A.4 Nominal Transport Times
The following table shows the time required for samples to move from the sampling point to the Vertex M system
for various lengths of sample lines.
O.D.
I.D.
Length in Feet
Length in Meters
1
2
# of
Analyzers
3
per line
Appendix A - Specifications
0.15 in. (Medium Wall) I.D.
100
200
30
61
15 sec.
30 sec.
45 sec.
8 sec.
15 sec.
Pressure Limited
5.0 sec.
Nominal Transport Time in Seconds
1.3-1.8 Liters per Minute per Point (1.5 LPM nominal)
Table A-2. Nominal Transport Times
0.25 in. Outside Diameter Tubing
300
400
100
91
122
60 sec.
22 sec.
11 sec.
7 sec.
B-4
0.190 in. (Thin Wall) I.D.
200
300
30
61
91
45 sec.
67 sec.
22 sec.
34 sec.
Pressure Limited
15 sec.
400
122
89 sec.
45 sec.