GE AKTA avant Operating Instructions Manual page 99

Preparative chromatography system
Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

Step
3
4
5
6
7
ÄKTA avant Operating Instructions 29101556 AB
Action
Connect a 25 to 30 ml syringe to one of the purge valves of either of the
system pumps. Make sure that the syringe fits tightly into the purge connec-
tor.
Open the purge valve by turning it counterclockwise about 3 quarters of a
turn. Draw 10 ml of liquid into the syringe. Check that the Q1 inlet is filled
with liquid.
Close the purge valve by turning it clockwise. Disconnect the syringe and
discard its contents.
Repeat steps 2 to 5 for Q2, Q3 and Q4 respectively by setting the respective
Quaternary start concentration to 100%.
Tip:
The inlet tubing that is immersed in distilled water should be the last piece of
inlet tubing to be primed.
Tip:
If you will perform a BufferPro run, end with either Q1 or Q2.
Check that there is no air left in the pump by following the instructions in
Validate prime or purge of System Pump A or B or Sample Pump, on page
If air bubbles are indicated, follow the instructions in
and the system pumps, on page
4.5 Prime inlets and purge pump heads
Purge Quaternary Valve
100.
4 Installation
4.5.3 Prime Q inlets
92.
99

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents