GE AKTA avant Operating Instructions Manual page 114

Preparative chromatography system
Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

5 Prepare the system for a run
5.4 Connect a column
Step
3
4
114
Action
Connect a suitable tubing to a column valve port, for example port 1A if
column position 1 was chosen in the method to be run.
In the Process Picture:
Click the Column valve icon.
Click, e.g., Position 1 and Down flow.
Click Set position
Result: The column valve switches to position 1.
ÄKTA avant Operating Instructions 29101556 AB

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents