Prime Inlets And Purge Pump Heads - GE AKTA avant Operating Instructions Manual

Preparative chromatography system
Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

4.5

Prime inlets and purge pump heads

About this section
Before using the sample pump or system pumps it is important to do the following:
This section describes how to prime the buffer inlets, sample inlets, and Q inlets, and
how to purge the system pumps and the sample pump.
In this section
This section contains the following subsections:
Section
4.5.1 Prime buffer inlets and purge system pumps
4.5.2 Prime sample inlets and purge Sample Pump
4.5.3 Prime Q inlets
ÄKTA avant Operating Instructions 29101556 AB
Prime the inlets (fill the inlets with liquid).
Purge the pumps (remove air from the pump heads).

4.5 Prime inlets and purge pump heads

4 Installation
See page
86
93
98
85

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents