GE AKTA avant Operating Instructions Manual page 89

Preparative chromatography system
Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

Step
3
4
ÄKTA avant Operating Instructions 29101556 AB
Action
In the Process Picture:
Click the Inlet valve B icon.
Click the position of one of the inlets that will be used at the beginning
of the run.
Result: The inlet valve switches to the selected port.
In the Process Picture:
Click the System pumps icon.
Set Conc % B to 100% B and click Set % B.
Set the System flow to 1.0 ml/min for ÄKTA avant 25 or 5.0 ml/min for
ÄKTA avant 150.
Click Set flow rate.
Result: Only System Pump B is active, and a system flow through injection
valve waste starts.
4.5 Prime inlets and purge pump heads
4.5.1 Prime buffer inlets and purge system pumps
4 Installation
89

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents