GE AKTA avant Operating Instructions Manual page 95

Preparative chromatography system
Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

Step
9
Purge Sample Pump
If the priming was done thoroughly and the final buffer was drawn all the way into the
syringe and the validation of the priming showed that there was no air left in the pump
it is not necessary to purge the sample pump.
However, if the pressure signal indicated air bubbles left in the pump, follow the instruction
below to purge both the pump heads of the sample pump.
Step
1
2
3
4
ÄKTA avant Operating Instructions 29101556 AB
Action
Check that there is no air left in the pump by following the instructions in
Validate prime or purge of System Pump A or B or Sample Pump, on page
If air bubbles are indicated, follow the instructions in
on page
95.
Action
Make sure that all sample inlet tubing that is to be used during the method
run is immersed in the correct buffers.
Make sure that the waste tubing connected to injection valve port W2 is
immersed in a waste vessel.
Open the System Control module.
In the Process Picture:
Click the Injection valve icon, and then click Sample pump waste.
Result: The injection valve switches to waste position. This is necessary
to achieve a low back pressure during the purge procedure.
4.5 Prime inlets and purge pump heads
4.5.2 Prime sample inlets and purge Sample Pump
4 Installation
92.
Purge Sample Pump,
95

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents