7.2 Replace Pump Piston Seal, O-Rings, And Rinse Membrane Of Pump P9 Or Pump - GE AKTA avant Operating Instructions Manual

Preparative chromatography system
Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

7 Maintenance
7.1 Maintenance program
Maintenance when required
The following maintenance should be performed by the user of the ÄKTA avant instrument
when required. Refer to the ÄKTA avant User Manual for detailed instructions.
Maintenance action
Clean the instrument externally
Run System CIP (System cleaning-in-place)
Run Column CIP (Column cleaning-in-place)
Clean the fraction collector
Replace tubing and connectors
Storage of pH electrode
Clean the pH electrode
Clean the conductivity flow cell
Calibrate the conductivity monitor
Calibrate the UV monitor
Calibrate pressure monitors
Replace the mixer
Replace O-ring in mixer
Replace the UV flow cell
Replace the flow restrictor
Replace inlet filters
Wipe off excess oil from pump heads
Clean the check valves. See
valves, on page 173
Replace check valves
Replace pump piston seal, O-rings, and rinse membrane. See
tion 7.2 Replace pump piston seal, O-rings, and rinse membrane of
Pump P9 or Pump P9H, on page 152
piston seal, O-ring, and rinse membrane of Pump P9-S, on page
Replace pump pistons. See
page
150
171.
Section 7.5 Clean pump head check
and
Section 7.3 Replace pump
Section 7.4 Replace pump pistons, on
ÄKTA avant Operating Instructions 29101556 AB
Sec-
163.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents