Required Materials - GE AKTA avant Operating Instructions Manual

Preparative chromatography system
Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

4.1.6

Required materials

Introduction
This section describes the accessories required for the installation and operation of the
ÄKTA avant instrument.
Buffers and solutions
The buffers and solutions listed in the following table are required during the installation
procedure and should be provided at the installation site.
Buffer/solution
Distilled water
1% acetone in distilled
water
1% acetone and 1 M NaCl
in distilled water
20% ethanol
Laboratory equipment
The equipment listed in the following table is required during the installation procedure
and should be provided at the installation site.
Equipment
Flasks, liquid containers
Gloves
Protective glasses
ÄKTA avant Operating Instructions 29101556 AB
Required volume
Scope of use
1 liter
Air sensor test, fraction collector
test, Quaternary Valve test and
system test
0.5 liter
Quaternary Valve test
0.5 liter
System test
200 ml
Priming of the pump piston rinsing
system
Specification
For buffers and waste
For protection
For protection
4 Installation
4.1 Site preparation
4.1.6 Required materials
63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents