GE AKTA avant Operating Instructions Manual page 90

Preparative chromatography system
Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

4 Installation
4.5 Prime inlets and purge pump heads
4.5.1 Prime buffer inlets and purge system pumps
Step
5
6
7
8
9
90
Action
Connect a 25 to 30 ml syringe to the purge valve of the left pump head of
System Pump B. Make sure that the syringe fits tightly into the purge con-
nector.
Open the purge valve by turning it counter-clockwise about three quarters
of a turn. Draw 5 to 10 ml of liquid slowly into the syringe with a rate of about
1 ml/s.
Close the purge valve by turning it clockwise. Disconnect the syringe and
discard its contents.
Connect the syringe to the purge valve on the right pump head of System
Pump B, and repeat steps 6 to 8. Keep the system flow running.
Check that there is no air left in the pump by following the instructions in
Validate prime or purge of System Pump A or B or Sample Pump, on page
ÄKTA avant Operating Instructions 29101556 AB
92.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents