Purge System Pump A
Purge both pump heads of System Pump A by following the same procedure as in
System Pump B, on page
Step
1
2
ÄKTA avant Operating Instructions 29101556 AB
88, but replace step 3 and 4 with the following:
Action
In the Process Picture:
Click the Inlet valve A icon.
Click the position of one of the inlets that will be used at the beginning
of the run.
Result: The inlet valve switches to the selected port.
In the Process Picture:
Click the System pumps icon.
Set Conc % B to 0% B and click Set % B.
Result: Only System Pump A is active.
4.5 Prime inlets and purge pump heads
4.5.1 Prime buffer inlets and purge system pumps