Panasonic DVC PRO Studio AJ-D950P Service Manual page 67

Vtr/analog video interface kit
Table of Contents

Advertisement

of the Main Cam Gear.
5.7.16. S5 Post Base Unit Replacement
(Removal of S5 Post Base Unit)
1. Remove the top panel.
2. Remove the front loading unit.
3. Remove the screw (A) and remove the S5 Post Base Unit.
(Installation of S5 Base Unit)
1. Install the new S5 Post Base Unit as reverse order of its removal.
Note:
Install the S5 Post by the position fix as shown in the figure.
2. After installation, Post Pre-adjustment and Linearity adjustment are
necessary.
Removal of Main Cam Gear
67

Advertisement

Table of Contents
loading

Table of Contents