4.
4.3.2 Cable Connections to the Power Supply and Distribution
System

4.3.2.1 Grounding the Smart Module

1.
2.
Figure 4-56 General ground bar
Issue 02 (2021-06-30)
Ensure that the cable ties are wrapped and secured in the same direction and
do not generate interference with subsequent operations, as shown in
4-55.
Figure 4-55 Direction for securing cable ties
Connect the ground point in the cabinet to the general ground bar.
Connect the general ground bar in the cabinet to the floor ground bar or
collective ground bar.