4.1.3 Site Equipment Preparation

Pay attention to the following when unpacking batteries:
● Insert a flat-head screwdriver into the gap between the wooden crate and its
top cover. Then pry off the top cover along the external edge of the cover until
the cover can be taken out from the crate.
● Be careful to prevent your hands from being hurt by nails during unpacking.

4.1.4 Installation Scenarios

Cabinet Internal Layout
Figure 4-2 Component layout in the cabinet scenario
Issue 02 (2021-06-30)
All cabinets and devices have been delivered to the site and checked against
the delivery list.
Cabinets and devices need to be transported to the specified positions based
on the detailed equipment room layout diagram and unpacked for further
installation.