Axis Status - Mitsubishi Electric A173UHCPU Programming Manual

Motion controller
Hide thumbs Also See for A173UHCPU:
Table of Contents

Advertisement

3. POSITIONING SIGNALS
3.1.1

Axis status

(1) Positioning start completed signal (M2400+20n)
(a) This signal comes ON when starting of positioning control of the axis
designated by the SVST instruction in the sequence program is completed.
It does not come ON when positioning control starts due to a zeroing, JOG
operation or manual pulse generator operation.
It can be used, for example, to read an M-code when positioning is started.
(See Section 8.2.)
(b) The positioning start completed signal goes OFF at the leading edge
(OFF→ON) of the end signal OFF command (M3204+20n) or when
positioning is completed.
At the leading edge (OFF → → → → ON) of the end signal OFF command
(M1804+20n)
SVST instruction
Start reception flag (M2001+n)
Positioning start completed
(Note-1)
signal (M1600+20n)
End signal OFF command
(Note-1)
(M3204+20n)
When positioning is completed
SVST instruction
Start reception flag (M2001+n)
Positioning start completed
(Note-1)
signal (M2400+20n)
REMARK
(Note-1):In the preceding descriptions, "n" in M2001+n, M3204+20n, etc.
indicates a value for each axis No. in the following tables.
Axis No.
1
2
3
4
5
6
7
8
Make the following calculation to find the device number corresponding to
each axis.
(Example) M3200+20n (stop command) = M3200+20×31=M3820
V
(Note-1)
OFF
OFF
OFF
V
(Note-1)
OFF
OFF
n
Axis No.
n
0
9
8
1
10
9
2
11
10
3
12
11
4
13
12
5
14
13
6
15
14
7
16
15
M3215+20n (servo off)
3 − 7
ON
ON
ON
Dwell time
ON
ON
Axis No.
n
Axis No.
17
16
18
17
19
18
20
19
21
20
22
21
23
22
24
23
= M3215+20×31=M3835
Dwell time
t
Positioning
completed
t
n
25
24
26
25
27
26
28
27
29
28
30
29
31
30
32
31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

A273uhcpu

Table of Contents