Installing Assemblies On Cement Floor With Poor Bearing Capacity; Installation Flowchart - Huawei BTS3606 Installation Manual

Airbridge cdma base station
Hide thumbs Also See for BTS3606:
Table of Contents

Advertisement

Installation Manual – BTS3606 Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
(1) M12%60 expansion bolt
(4) Insulating covering
Figure 2-14 Installing the lower support
VI. Leveling the lower support
See section 2.4.2 IV. "Leveling the Lower Support".
VII. Conducting insulation test
See section 2.4.2 V. "Conducting Insulation Test".
2.6 Installing Assemblies on Cement Floor with Poor
Bearing Capacity
This section details the procedures of installing lower support and U-bar support on
cement floor of insufficient bearing capacity.

2.6.1 Installation Flowchart

Figure 2-15 shows how to install cabinet assemblies (U-bar support and lower
support) on the cement floor with insufficient bearing capacity.
(2) Spring washer
(5) Gasket
Huawei Technologies Proprietary
2-17
Chapter 2 Installing Cabinet Assemblies
(3) Plain washer

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bts3606a

Table of Contents