Installing Boards In Baseband Subrack; Precautions - Huawei BTS3606 Installation Manual

Airbridge cdma base station
Hide thumbs Also See for BTS3606:
Table of Contents

Advertisement

Installation Manual – BTS3606 Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
C
C
H
T
P
R
A
M
C
C
H
T
P
R
A
M
P
S
U
Figure 3-5 BTS3606 cabinet configuration

3.4 Installing Boards in Baseband Subrack

Baseband boards include BCIM, BCKM, and CCPM/CECM. This section explains
installation of boards in the baseband subrack and the attentions must be paid during
the operation.
Note:
The slot for the channel processing board is marked as "CEM", that Is, channel element
module. Either the CCPM or the CECM can reside on this slot.

3.4.1 Precautions

Pay attention to the following points:
Before installing boards and modules, check whether the DIP switches (if any) on
the backplane and the boards are correctly set according to the silk screen printed
on the boards.
Switch box
CDDU
Fan box
C
C
C
C
C
C
C
B
B
C
C
C
C
C
H
T
H
T
P
P
P
K
I
P
R
P
R
M
M
M
M
M
A
M
A
M
Cabling trough
C
C
C
C
B
C
C
C
H
T
H
T
C
C
C
C
P
P
P
K
P
R
P
R
M
M
M
M
A
M
A
M
Cabling trough
P
P
S
S
U
U
Tool kit
Huawei Technologies Proprietary
Chapter 3 Installing Cabinet and Cabinet Equipment
3-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bts3606a

Table of Contents