Installation Conditions - Huawei BTS3606 Installation Manual

Airbridge cdma base station
Hide thumbs Also See for BTS3606:
Table of Contents

Advertisement

Installation Manual – BTS3606 Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
Table 1-2 Tools and instruments
General
tools
Special tools
Instruments
Note:
The equipment supplier provides the tool list and consults to the customer to specify
the tool provider. The wire punchdown tool is delivered along with the cabinet.
Check the meters to ensure that they are qualified for use.

1.3 Installation Conditions

The project supervisor must do the following:
Check the construction conditions.
Fill out the Installation Environment Checklist.
Sign the Kickoff Agreement with the customer if all conditions are ready.
Formulate the Project Installation Plan.
If the installation is not prepared as required, fill out the Onsite Work Liaison Form to
declare the reason for kickoff postpone.
Measuring
and
Long tape, ruler (1 m), marker, powder marker,
marking
pencil
instruments
Drilling
One percussion drill, some matched drill bits, one
tools
cleaner
Flathead screwdrivers: M3 – M6
Cross screwdrivers: M3 – M6
Adjustable wrenches
Clamping
Socket wrenches: M6, M8, M12, M14, M17, and
tools
M19
Double offset ring spanner: M6, M8, M12, M14,
M17, and M19
Sharp-nose pliers, diagonal pliers, pliers, hand-held
electric drill, file, handsaw, crowbar, and rubber
Pliers
hammer
Auxiliary
Brush, nipper, paper knife, bellows, electric irons,
tools
solder wire, fork, and ladders
Earth resistance tester, ESD-preventive wrist strap, ESD-preventive
gloves, cable peeler, crimping pliers, RJ-45 connector crimping
pliers, optical connector, and wire punchdown tool
Universal meter, 500 V megaohm meter (for testing the insulation
resistance), BER tester, and optical power meter
Huawei Technologies Proprietary
1-2