Cisco 10008 Hardware Installation Manual page 57

Hardware installation guide
Table of Contents

Advertisement

Chapter 3
Installing the Cisco 10008 Router
Figure 3-12
P O W E R
M IS W IR
Power off the chassis by setting the DC or AC PEM power switch (or switches) to the Off position (see
Step 1
Figure 3-12
Strip about 3/4 inch (2 cm) of the covering from the end of the grounding wire (see
Step 2
Insert the stripped end of the grounding wire into the open end of a grounding lug and crimp the
Step 3
grounding lug securely to the wire
Figure 3-13
1
Wire
OL-0659-13
Setting PEM Switches to the Off Position
PO WE R
FAU LT
MIS WIR
E
PO WE R
FAU LT
MIS WIR
E
F A U L T
E
for an example of the DC PEM power switches).
Attaching Grounding Wire to Grounding Lug
0.75 in.
(2cm)
1
FAN S
OK
FAN
FAIL URE MUL TI-
FAN
FAIL URE
CAU TIO
Whe n hot
N
rem oval
swa ppin
g this fan
be don
and repl
tray,
e in und
ace men
syst em
er two
t mus t
shu tdow
min utes
n will occu
or
r.
1
2
3
4
0A
PR OC
CIS CO
ES SO R
0B
100 00
CIS CO
ON LY
100 00
CIS CO
5
100 00
C10 000
CIS CO
6
100 00
CIS CO
7
6CT 3
8
100 00
CIS CO
100 00
C10 000
CIS CO
C10 000
FAIL
100 00
CIS CO
6CT 3
100 00
C10 000
CIS CO
6CT 3
100 00
6CT 3
CIS CO
100 00
FAIL
FAIL
FAIL
POR T0
POR T0
POR T1
POR T0
POR T0
POR T1
ALA RM
POR T2
S
POR T1
ALA RM
POR T1
S
POR T2
POR T3
POR T2
POR T2
POR T3
POR T4
POR T3
POR T3
POR T4
POR T5
POR T4
POR T4
POR T5
POR T5
POR T5
PR OC
ES SO R
ON LY
(Figure
3-13).
2
2
Grounding lug
Cisco 10008 Router Hardware Installation Guide
Connecting the Chassis to Ground
Figure
3-13).
3-15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Esr10008 - 10000 modular expansion base

Table of Contents