A9. Route The Antennas To The Rack Cavity; A10. Mount The Remaining Cavities - Cisco Room Panorama Installation Manual

85-inch main screens
Table of Contents

Advertisement

A9. Route the antennas to the rack cavity

Skip this step if you have a non-radio product.
product identifier (PID), are delivered without antennas.
Cable glands
2x
Cable gland
C5
1. Thread the two antennas, which you added in
step A4, up through the small holes in the rack
cavity. The antennas are identical.
Non-radio products, which have the letters 'NR' in their
2. Attach cable glands to the antennas for strain
relief, about 0.30 m (11 in.) from the connector.
3. Fasten the antennas to the risers with velcro
to prevent them from touching the subwoofers
and cause rattling noise.

A10. Mount the remaining cavities

Follow
steps 4.2-4.5
starting on page 17 in the
main part of the installation guide to:
Insert the cooling cavity
Insert the power cavities
Insert the display cavities
Fasten the six cavities with screws
Skip step 5.
107

Advertisement

Table of Contents
loading

Table of Contents